12 door shoes cabinet Feature:
1.12 doors shoe cabinet surface: powder coating, electrostatic spraying
2.Material: high quality cold rolled steel plate, the thickness of steel plate from 0.5mm-1.0mm
3.Each shoe cabinet has ventilation holes
4.Advanced knockdown construction which could be assembled within 5-8mins
5.Widely used in the office, hotel, bank, school and other public place
6.Color: any shoe cabinet color is available based on RAL color chart
7.Suitable for large parcels storage
8.Best frequently-used storage tool
9.Door could choose according to your request
10 .Key lock, padlock, combination lock is possible
12 door shoes cabinet Description:
Item Name | 12 door shoes cabinet |
Material | Steel cold roll steel sheet /Electro-Galvanized Steel |
Size | W900*D400*H925mm |
Tickness | 0.6-1.5 MM |
Packing Volume | 0.09CBM |
Loading Quantities | 20'GP-162/set 40'GP-315/set 40'HQ-395/set |
Warranty | 5 Years |
Using Area | School, Hospital, Factory,Changing room,. etc. |
Available Color | RAL, Dulux |
Available Structure | Full assembley or Disawwembley(Knock-Down design) |
Available Lock | Padlock, cam lock, Code lock, Coin lock,Electronic lock |
Available Door | Swing door,Silding door,Tambour door,No door |
Standard Function | Card slot, Air vent |
Bearing capacity | Standard 50KG or Customizable |
Manufacturer Process:
1. cutting: According to the design-drawings,the steel sheets are cut into the different sizes by the high-accuracy machines, without error and burrs.
2. pressing: The CNC machine tools and other machine tools work with the big-scale moulds together to realize the standard and flowline production,which assure the production efficiency and quality.
3. Bending: Skilled manpower and advanced facilities make sure the clear lines and perfect appearance.
4. welding: Locate work pieces into the fixed mould, firmly weld with CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.
5. Coating: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing , phosphating etc. The importing automatic sprayfacilities and top-quality powder promise the coating to be flat and smooth, non-toxic and smell.
6. Installation: To ensure the firmness of every screw, the installaion work shop adopts pneumatic tools to conduct mass and flowline production.
7. Packing and storage: Strict and special testing before packing and storage to make sure the percentage of the pass.