4 Door Steel Lockers Feature:
1.Surface: powder coating, electrostatic spraying.
2.Material: High quality cold rolled steel plate, the thickness of steel plate from 0.6mm-1.2mm.
3.Advanced knock down construction which could be assembled within 6-10 minutes.
4.Different dimension/size is available for locker.
5.Color:any color is available based on RAL .
6.Clearance: the space after product assembly is less than 1.5mm, all spare parts with high standardize level, easy to exchange.
7.OEM service, producing according to your detailed requirements.
4 Door Steel Lockers Description:
tem Name | 4 Door Steel Lockers |
Model | 2L-B2 |
Material | Steel cold roll steel sheet /Electro-Galvanized Steel |
Size | W760*D450*H1850MM |
Tickness | 0.6-1.5 MM |
Packing Valume | 0.104CBM |
Loading Quantities | 20'GP-259/set 40'GP-514/set 40'HQ-653/set |
Warranty | 5 Years |
Using Area | School, Hospital, Factory,Changing room,. etc. |
Available Color | RAL, Dulux |
Available Structure | Full assembley or Disawwembley(Knock-Down design) |
Available Lock | Padlock, cam lock, Code lock, Coin lock,Electronic lock |
Available Door | Swing door,Silding door,Tambour door,No door |
Standard Function | Card slot, Air vent |
Bearing capacity | Standard 50KG or Customizable |
Manufacturer Process:
1. cutting: According to the design-drawings,the steel sheets are cut into the different sizes by the high-accuracy machines, without error and burrs.
2. pressing: The CNC machine tools and other machine tools work with the big-scale moulds together to realize the standard and flowline production,which assure the production efficiency and quality.
3. Bending: Skilled manpower and advanced facilities make sure the clear lines and perfect appearance.
4. welding: Locate work pieces into the fixed mould, firmly weld with CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.
5. Coating: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing , phosphating etc. The importing automatic sprayfacilities and top-quality powder promise the coating to be flat and smooth, non-toxic and smell.
6. Installation: To ensure the firmness of every screw, the installaion work shop adopts pneumatic tools to conduct mass and flowline production.
7. Packing and storage: Strict and special testing before packing and storage to make sure the percentage of the pass.