FC-D2 Steel Storage Cabiner With 2 Drawer Feature:
Full glass door design is easy to find the desired files.
2 layer adjustable shelf,Loading 50 Kg per shelf
Dual color or RAL color
Wangtong famous lock are safe
Handle:ABS integlated mobding,convenitent handle
900mm high mini cabinets can be used by matching other filing cabinets or 2 mini cabinets together, which are flexible.
FC-D2 Steel Storage Cabiner With 2 Drawer Description:
Item Name | Steel Storage Cabiner With 2 Drawer |
Model | FC-D2 |
Material | Steel cold roll steel sheet /Electro-Galvanized Steel |
Size | W900*D400*H1000mm |
Tickness | 0.6-1.5 MM |
Packing Volume | 0.104CBM |
Loading Quantities | 20'GP-259/set 40'GP-519/set 40'HQ-653/set |
Warranty | 5 Years |
Using Area | School, Hospital, Factory,Changing room,. etc. |
Available Color | RAL, Dulux |
Available Structure | Full assembley or Disawwembley(Knock-Down design) |
Available Lock | Padlock, cam lock, Code lock, Coin lock,Electronic lock |
Available Door | Swing door,Silding door,Tambour door,No door |
Standard Function | Card slot, Air vent |
Bearing capacity | Standard 50KG or Customizable |
Manufacturer Process:
1. cutting: According to the design-drawings,the steel sheets are cut into the different sizes by the high-accuracy machines, without error and burrs.
2. pressing: The CNC machine tools and other machine tools work with the big-scale moulds together to realize the standard and flowline production,which assure the production efficiency and quality.
3. Bending: Skilled manpower and advanced facilities make sure the clear lines and perfect appearance.
4. welding: Locate work pieces into the fixed mould, firmly weld with CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.
5. Coating: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing , phosphating etc. The importing automatic sprayfacilities and top-quality powder promise the coating to be flat and smooth, non-toxic and smell.
6. Installation: To ensure the firmness of every screw, the installaion work shop adopts pneumatic tools to conduct mass and flowline production.
7. Packing and storage: Strict and special testing before packing and storage to make sure the percentage of the pass.