Storage Cabinet
  • >
  • Products
  • >
  • Storage Cabinet
  • FC-G5 Swing Glass Two Doors Metal cabinet
  • FC-G5 Swing Glass Two Doors Metal cabinet
  • FC-G5 Swing Glass Two Doors Metal cabinet
  • FC-G5 Swing Glass Two Doors Metal cabinet
  • FC-G5 Swing Glass Two Doors Metal cabinet
  • FC-G5 Swing Glass Two Doors Metal cabinet
  • Quick Details
  • Model:FC-G5 Swing Glass Two Doors Metal cabinet
  • Size:W900*D400*H1850mm
  • Thickness:0.6mm as regular ; 0.5mm-1.2mm optional
  • Packing Volume:0.137cbm
  • Structure:known down
  • Surface:Environment protection powder coated
  • Material:high quality cold rolled steel
  • Min.Order Quantity:10
Download:
Feature
Quality Control
Project Case
Video

FC-G5 Swing Glass Two Doors Metal cabinet Feature:

1. Knocked down structure, easy assembly and saving shipping cost.

2. Shelves loading capacity: about 60-100kgs (up to metal thickness).

3. Adjustable shelves for different storage purposes.

4. Full glass door design is easy to find the desired files.

5. Strong shelf clips for supporting shelves.

6.Mainly used for storage various files & documents.


FC-G5 Swing Glass Two Doors Metal cabinet Description:


Item Name Swing Glass Two Doors Metal cabinet
 Model  FC-G5
 Material Steel cold roll steel sheet /Electro-Galvanized Steel
 Size W900*D400*H1850MM
 Tickness  0.6-1.5 MM
Packing Volume 0.137CBM
 Loading Quantities 20'GP-197/set  40'GP-394/set   40'HQ-496/set
 Warranty

 5 Years

 Using Area School, Hospital, Factory,Changing room,. etc.
 Available Color RAL, Dulux
 Available Structure Full assembley  or  Disawwembley(Knock-Down design)
 Available Lock Padlock, cam lock, Code lock, Coin lock,Electronic lock
 Available Door Swing door,Silding door,Tambour door,No door
 Standard Function Card slot, Air vent
 Bearing capacity Standard 50KG or Customizable




Manufacturer Process:

1. cutting: According to the design-drawings,the steel sheets are cut into the different sizes by the high-accuracy machines, without error and burrs.

2. pressing: The CNC machine tools and other machine tools work with the big-scale moulds together to realize the standard and flowline production,which assure the production efficiency and quality.

3. Bending: Skilled manpower and advanced facilities make sure the clear lines and perfect appearance.

4. welding: Locate work pieces into the fixed mould, firmly weld with CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.

5. Coating: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing , phosphating etc. The importing automatic sprayfacilities and top-quality powder promise the coating to be flat and smooth, non-toxic and smell.

6. Installation: To ensure the firmness of every screw, the installaion work shop adopts pneumatic tools to conduct mass and flowline production.

7. Packing and storage: Strict and special testing before packing and storage to make sure the percentage of the pass.

Message
Related Products
<
>