FC-M5N Steel Cabinets For Office Feature:
1. Double cabinet,4 metal door
2. Knock down structure, easy transportation and assemble
3. Storage:key document,A4,Document,Large space
4. Number Of Adjustable Shelves:2-3 shelves,Loading:50Kg per shelf.
5. Heavy-gauge welded steel and sturdy box-formed construction
6. Four adjustable shelves with built-in support tabs hold up to 50Kg each
7. Size:W35.4" X D17.7"X H72.8"
8 .Handle:Red, ABS integrated molding,conveniment handle,strong wear resistance
FC-M5N Steel Cabinets For Office Description:
Item Name | Four Door Steel Office File Cabinets |
Model | FC-M5 |
Material | Steel cold roll steel sheet /Electro-Galvanized Steel |
Size | W900*D400*H1850MM |
Tickness | 0.6-1.5 MM |
Packing Volume | 0.137CBM |
Loading Quantities | 20'GP-197/set 40'GP-394/set 40'HQ-496/set |
Warranty | 5 Years |
Using Area | School, Hospital, Factory,Changing room,. etc. |
Available Color | RAL, Dulux |
Available Structure | Full assembley or Disawwembley(Knock-Down design) |
Available Lock | Padlock, cam lock, Code lock, Coin lock,Electronic lock |
Available Door | Swing door,Silding door,Tambour door,No door |
Standard Function | Card slot, Air vent |
Bearing capacity | Standard 50KG or Customizable |
Manufacturer Process:
1. cutting: According to the design-drawings,the steel sheets are cut into the different sizes by the high-accuracy machines, without error and burrs.
2. pressing: The CNC machine tools and other machine tools work with the big-scale moulds together to realize the standard and flowline production,which assure the production efficiency and quality.
3. Bending: Skilled manpower and advanced facilities make sure the clear lines and perfect appearance.
4. welding: Locate work pieces into the fixed mould, firmly weld with CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.
5. Coating: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing , phosphating etc. The importing automatic sprayfacilities and top-quality powder promise the coating to be flat and smooth, non-toxic and smell.
6. Installation: To ensure the firmness of every screw, the installaion work shop adopts pneumatic tools to conduct mass and flowline production.
7. Packing and storage: Strict and special testing before packing and storage to make sure the percentage of the pass.