● 27 Yrs Manufacture ● 5 Yrs Warranty ● 3 Factories ● OEM/ODM Serives
LG-03 Steel cupboard locker Feature:
These cupboards were constructed of 0.6mm steel sheet before painting, ideal for almost any place you want such as office, living room,bookroom etc. Doors were equiped with glass, outside with one pair of hard plastic handles (wangtong 9871A lock), inside with 2~4 enhanced weighing shelves according the height or as per your requests, and bottom with four adjusters.
1.Hard plastic handles
2.WANGTONG 0709 LOCK with poles
3.High quality stainless steel rod
4.3 or 4 Cold-punched air vents
Inch Size: W33.4" X D15.7"X H70.8"
Additional thing
1.Color and handle can be choose
2.Number of shelf can be changed as request
LG-03 Steel cupboard locker
Item Name | LG-03 Steel cupboard locker |
Material | Steel cold roll steel sheet /Electro-Galvanized Steel |
Size | W850*D400*H1800mm |
Tickness | 0.6-1.5 MM |
Packing Volume | 0.119CBM |
Loading Quantities | 20'GP-145/set 40'GP-289/set 40'HQ-358/set |
Warranty | 5 Years |
Using Area | School, Hospital, Factory,Changing room,. etc. |
Available Color | RAL, Dulux |
Available Structure | Full assembley or Disawwembley(Knock-Down design) |
Available Lock | Padlock, cam lock, Code lock, Coin lock,Electronic lock |
Available Door | Swing door,Silding door,Tambour door,No door |
Standard Function | Card slot, Air vent |
Bearing capacity | Standard 50KG or Customizable |
Manufacturer Process:
1. cutting: According to the design-drawings,the steel sheets are cut into the different sizes by the high-accuracy machines, without error and burrs.
2. pressing: The CNC machine tools and other machine tools work with the big-scale moulds together to realize the standard and flowline production,which assure the production efficiency and quality.
3. Bending: Skilled manpower and advanced facilities make sure the clear lines and perfect appearance.
4. welding: Locate work pieces into the fixed mould, firmly weld with CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.
5. Coating: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing , phosphating etc. The importing automatic sprayfacilities and top-quality powder promise the coating to be flat and smooth, non-toxic and smell.
6. Installation: To ensure the firmness of every screw, the installaion work shop adopts pneumatic tools to conduct mass and flowline production.
7. Packing and storage: Strict and special testing before packing and storage to make sure the percentage of the pass.