WD-H2N Mobile File Cabinet Feature
1.Advanced Knocked-down Construction,assembled within 6-10 minutes
2.Material:0.6-1.2mm cold rolled steel with High quality powder coating finishing
3.45kg load rated 3-section ball bearing runners on all drawers Drawers could be opened 100%
4.Anti-tilt mechanism, just one drawer could be pulled out at one time
5.Drawer are designed to accommodate A4,Letter and Legal size
6.Each drawer is equipped with one adjustable filing hangers or dividing panels
7.Different colors available, Drawer fronts and Body can be in different colors
WD-H2 Mobile Cabinet Description
Item Name | WD-H2N Mobile File Cabinet |
Material | Steel cold roll steel sheet /Electro-Galvanized Steel |
Size | W400*D540*H660mm |
Tickness | 0.6-1.5 MM |
Packing Volume | 0.163CBM |
Loading Quantities | 20'GP-160/set 40'GP-321/set 40'HQ-404/set |
Warranty | 5 Years |
Using Area | School, Hospital, Factory,Changing room,. etc. |
Available Color | RAL, Dulux |
Available Structure | Full assembley or Disawwembley(Knock-Down design) |
Available Lock | Padlock, cam lock, Code lock, Coin lock,Electronic lock |
Available Door | Swing door,Silding door,Tambour door,No door |
Standard Function | Card slot, Air vent |
Bearing capacity | Standard 50KG or Customizable |
Manufacturer Process:
1. cutting: According to the design-drawings,the steel sheets are cut into the different sizes by the high-accuracy machines, without error and burrs.
2. pressing: The CNC machine tools and other machine tools work with the big-scale moulds together to realize the standard and flowline production,which assure the production efficiency and quality.
3. Bending: Skilled manpower and advanced facilities make sure the clear lines and perfect appearance.
4. welding: Locate work pieces into the fixed mould, firmly weld with CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.
5. Coating: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing , phosphating etc. The importing automatic sprayfacilities and top-quality powder promise the coating to be flat and smooth, non-toxic and smell.
6. Installation: To ensure the firmness of every screw, the installaion work shop adopts pneumatic tools to conduct mass and flowline production.
7. Packing and storage: Strict and special testing before packing and storage to make sure the percentage of the pass.