Mobile Pedestal
  • >
  • Products
  • >
  • Mobile Pedestal
  • WD-H3 Mobile pedestal Cabinet
  • WD-H3 Mobile pedestal Cabinet
  • WD-H3 Mobile pedestal Cabinet
  • WD-H3 Mobile pedestal Cabinet
  • WD-H3 Mobile pedestal Cabinet
  • WD-H3 Mobile pedestal Cabinet
  • Quick Details
  • Model:WD-H3 Mobile pedestal Cabinet
  • Size:W420*D540*H620mm
  • Thickness:0.6mm; 0.5--1.0mm optional
  • Packing Volume:0.168cbm
  • Structure:Full assemble
  • Surface:Environment protection powder coated
  • Material:high quality cold rolled steel sheet
  • Min.Order Quantity:50pcs
Download:
Feature
Quality Control
Project Case
Video

● 27 Yrs Manufacture    ● 5 Yrs Warranty     3 Factories    ● OEM/ODM Serives


WD-H3 Mobile Cabinet Feature

1.3 drawers mobile cabinet fits under most desks; One lock with 2 keys controls all three drawers.

2.Two stationery drawers and one filing drawer with one removable hanging bar accommodates A4, letter and legal size.

3.Five casters:2 front casters can be locked and 1 auxiliary caster prevents tipping; Fully assembled except the casters.

4.Fully assembled except the casters

5.Solid steel construction,The drawer loading capacity:35KG


Inch Size: W15.3" X D19.6"X H23.6"


WD-H3 Mobile Cabinet Description


Item Name WD-H3 Mobile Cabinet
 Material Steel cold roll steel sheet /Electro-Galvanized Steel
 Size W390*D500*H600mm
 Tickness  0.6-1.5 MM
Packing Volume 0.16CBM
 Loading Quantities 20'GP-168/set  40'GP-362/set   40'HQ-425/set
 Warranty

 5 Years



Manufacturer Process:

1. cutting: According to the design-drawings,the steel sheets are cut into the different sizes by the high-accuracy machines, without error and burrs.

2. pressing: The CNC machine tools and other machine tools work with the big-scale moulds together to realize the standard and flowline production,which assure the production efficiency and quality.

3. Bending: Skilled manpower and advanced facilities make sure the clear lines and perfect appearance.

4. welding: Locate work pieces into the fixed mould, firmly weld with CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.

5. Coating: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing , phosphating etc. The importing automatic sprayfacilities and top-quality powder promise the coating to be flat and smooth, non-toxic and smell.

6. Installation: To ensure the firmness of every screw, the installaion work shop adopts pneumatic tools to conduct mass and flowline production.

7. Packing and storage: Strict and special testing before packing and storage to make sure the percentage of the pass.

Message
Related Products
<
>