● 27 Yrs Manufacture ● 5 Yrs Warranty ● 3 Factories ● OEM/ODM Serives
DL-D4 4 Drawer Filing Cabinet Feature
1.Sturdy, fireproof, moisture and dustproof: The vertical file cabinet was made of metal, sturdy, fireproof, moisture and dustproof
2.1 lock secures all 4 drawers, comes with 2 keys for your locking filing cabinet.
3.Anti-tilt mechanism: The deep, spacious drawers slide open easily with a smooth-gliding mechanism which allows only one drawer to be open at a time. To help guard against tipping.
4.Deep and spacious drawers accommodate A4, F4, letter sized and legal sized suspension files.
5.Ball-bearing full-suspension drawers that open and close quietly and easily.
6.40kg loading capacity for each drawer.
7.Integrated handle
8.steel sturcture,easy to assemble
Inch Size: W17.7" X D24.4"X H52.6"
Additional thing
1.Color and handle can be choose
2.Number of shelf can be changed as request
DL-D4 4 Drawer Filing Cabinet Description
tem Name | 4 Drawer Vertical Filing Cabinet |
Model | DL-D4 |
Material | Steel cold roll steel sheet /Electro-Galvanized Steel |
Size | W450*D620*H1330MM |
Tickness | 0.6-1.5 MM |
Packing Volume | 0.098CBM |
Loading Quantities | 20'GP-275/set 40'GP-591/set 40'HQ-693/set |
Warranty | 5 Years |
Manufacturer Process:
1. cutting: According to the design-drawings,the steel sheets are cut into the different sizes by the high-accuracy machines, without error and burrs.
2. pressing: The CNC machine tools and other machine tools work with the big-scale moulds together to realize the standard and flowline production,which assure the production efficiency and quality.
3. Bending: Skilled manpower and advanced facilities make sure the clear lines and perfect appearance.
4. welding: Locate work pieces into the fixed mould, firmly weld with CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.
5. Coating: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing , phosphating etc. The importing automatic sprayfacilities and top-quality powder promise the coating to be flat and smooth, non-toxic and smell.
6. Installation: To ensure the firmness of every screw, the installaion work shop adopts pneumatic tools to conduct mass and flowline production.
7. Packing and storage: Strict and special testing before packing and storage to make sure the percentage of the pass.