Storage Cabinet
  • >
  • Products
  • >
  • Storage Cabinet
  • Steel storage Cabinet with 4 Shelves
  • Steel storage Cabinet with 4 Shelves
  • Steel storage Cabinet with 4 Shelves
  • Steel storage Cabinet with 4 Shelves
  • Quick Details
  • Model:Steel storage Cabinet with 4 Shelves
  • Size:W900*D400*H1850mm
  • Thickness:0.6mm as regular ; 0.5mm-1.2mm optionall
  • Packing Volume:0.137cbm
  • Structure:konck down
  • Surface:Environment protection powder coated
  • Material:high quality cold rolled steel
  • Min.Order Quantity:20pcs
Download:
Feature
Quality Control
Project Case
Video

Steel storage Cabinet with 4 Shelves Feature:

1.This Door can Open 180°convenient to take out the files

2.Knock down structure, easily transported and assembled.

3.4 adjustable shelves ,Loading 50KG Per Shelves

4.3-point locking system for extra securit

5.Three sets of hinges per door

6.Size:W35.4"XD17.7"XH72.8"


Steel storage Cabinet with 4 Shelves Description:



Item NameSteel storage Cabinet with 4 Shelves
 Model A-2D
 MaterialSteel cold roll steel sheet /Electro-Galvanized Steel
 Size W900*D450*H1850MM
 Tickness  0.6-1.5 MM
Packing Volume0.137CBM
 Loading Quantities  20'GP-197/set  40'GP-394/set   40'HQ-496/set
 Warranty

 5 Years

 Using Area School, Hospital, Factory,Changing room,. etc.
 Available Color RAL, Dulux
 Available Structure Full assembley  or  Disawwembley(Knock-Down design)
 Available LockPadlock, cam lock, Code lock, Coin lock,Electronic lock
 Available DoorSwing door,Silding door,Tambour door,No door
 Standard Function Card slot, Air vent
 Bearing capacity Standard 50KG or Customizable




Manufacturer Process:

1. cutting: According to the design-drawings,the steel sheets are cut into the different sizes by the high-accuracy machines, without error and burrs.

2. pressing: The CNC machine tools and other machine tools work with the big-scale moulds together to realize the standard and flowline production,which assure the production efficiency and quality.

3. Bending: Skilled manpower and advanced facilities make sure the clear lines and perfect appearance.

4. welding: Locate work pieces into the fixed mould, firmly weld with CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.

5. Coating: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing , phosphating etc. The importing automatic sprayfacilities and top-quality powder promise the coating to be flat and smooth, non-toxic and smell.

6. Installation: To ensure the firmness of every screw, the installaion work shop adopts pneumatic tools to conduct mass and flowline production.

7. Packing and storage: Strict and special testing before packing and storage to make sure the percentage of the pass.

Message
Related Products
<
>