Steel Rack
  • >
  • Products
  • >
  • Steel Rack
  • S-G2D Heavy-Goods Rack
  • S-G2D Heavy-Goods Rack
  • Quick Details
  • Model:S-G2D Heavy-Goods Rack
  • Size:W1800*D500*H2000mm
  • Thickness:Generally 0.6mm, 0.4-1.5mm optional
  • Packing Volume:0.39cbm
  • Structure:knock down structure
  • Surface:Electrostatic powder coating
  • Material:high quality cold rolled steel
  • Min.Order Quantity:20pcs
Download:
Feature
Quality Control
Project Case
Video

S-G2D Heavy-Goods Rack

1.Top quality assurance with strict QC

2.High-class cold rolled steel plate and accessories

3.Style customization with professional design

4.Knock-down structure, easy to assemble and delivery with low cost

5.Strong packing with polyfoam inner lining and multi-layer carton box to keep safe in delivery

6.OEM Service ,produce according to the drawing 

S-G2D Heavy-Goods Rack

Item Name Heavy-Goods Rack
 Model   S-G2D
 Material Steel cold roll steel sheet /Electro-Galvanized Steel
 Size W1800*D500*H2000MM
 Tickness  0.6-1.5 MM
Packing Volume 0.39CBM
 Loading Quantities 20'GP-69/set  40'GP-138/set   40'HQ-174/set
 Warranty

 5 Years

 Using Area School, Hospital, Factory,Changing room,. etc.
 Available Color RAL, Dulux
 Available Structure Full assembley  or  Disawwembley(Knock-Down design)
 Available Lock Padlock, cam lock, Code lock, Coin lock,Electronic lock
 Available Door Swing door,Silding door,Tambour door,No door
 Standard Function Card slot, Air vent
 Bearing capacity Standard 50KG or Customizable


Manufacturer Process:

1. cutting: According to the design-drawings,the steel sheets are cut into the different sizes by the high-accuracy machines, without error and burrs.

2. pressing: The CNC machine tools and other machine tools work with the big-scale moulds together to realize the standard and flowline production,which assure the production efficiency and quality.

3. Bending: Skilled manpower and advanced facilities make sure the clear lines and perfect appearance.

4. welding: Locate work pieces into the fixed mould, firmly weld with CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.

5. Coating: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing , phosphating etc. The importing automatic sprayfacilities and top-quality powder promise the coating to be flat and smooth, non-toxic and smell.

6. Installation: To ensure the firmness of every screw, the installaion work shop adopts pneumatic tools to conduct mass and flowline production.

7. Packing and storage: Strict and special testing before packing and storage to make sure the percentage of the pass.

Message
Related Products
<
>