Z-B2 Z shape Locker
1.Surface: powder coating, electrostatic spraying.
2.Material: High quality cold rolled steel plate, the thickness of steel plate from 0.6mm-1.2mm.
3.Advanced knock down construction which could be assembled within 6-10 minutes.
4.Different dimension/size is available for locker.
5.Color:any color is available based on RAL .
6.Clearance: the space after product assembly is less than 1.5mm, all spare parts with high standardize level, easy to exchange.
7.OEM service, producing according to your detailed requirements.
Model No. | Z-B2 Z-style Steel Locker | ||
Size | W380*D450*H1850mm | ||
Material | high quality cold rolled steel | ||
accept customization | |||
Warranty | 5 Years | ||
Thickness | 0.6mm as regular ; 0.5mm-1.2mm optional | ||
Packing details | packing volum: 0.059cbm | ||
konck down,in multi-layer carton box with polyfoam inner lining | |||
Surface | Environment protection powder coated | ||
Color | Different colors are available according to the RAL | ||
Accessories | handles and lock can be customized | ||
Max loading quality(Pcs) | 20gGP | 40GP | 40HQ |
625pcs | 1244pcs | 1300pcs |
Manufacturer Process:
1. cutting: According to the design-drawings,the steel sheets are cut into the different sizes by the high-accuracy machines, without error and burrs.
2. pressing: The CNC machine tools and other machine tools work with the big-scale moulds together to realize the standard and flowline production,which assure the production efficiency and quality.
3. Bending: Skilled manpower and advanced facilities make sure the clear lines and perfect appearance.
4. welding: Locate work pieces into the fixed mould, firmly weld with CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.
5. Coating: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing , phosphating etc. The importing automatic sprayfacilities and top-quality powder promise the coating to be flat and smooth, non-toxic and smell.
6. Installation: To ensure the firmness of every screw, the installaion work shop adopts pneumatic tools to conduct mass and flowline production.
7. Packing and storage: Strict and special testing before packing and storage to make sure the percentage of the pass.